The City’s contractor, Skookum Asphalt, will be overlaying a section of Range Road from the McIntyre Creek bridge to Eagle Point Lookout.
The work will begin on Monday, June 5 and last until Friday, June 9, weather dependent.
One-way traffic will be available during the work, but drivers are encouraged to use another route during construction, if possible.
Please drive with care, reduce speed, obey traffic controllers and construction signage.
For more information, please contact Skookum Asphalt at 668-6326 or the City’s Engineering Services department at 668-8305.