Hamilton Boulevard

Print
Press Enter to show all options, press Tab go to next option

Overview

In 2019, the City conducted a transportation study for the Hamilton Boulevard corridor to identify existing transportation issues and develop potential solutions.

The study area included Hamilton Boulevard from McIntyre Drive (south) to Falcon Drive (south).

Documents

Title Revision Date Description
Hamilton Boulevard Transportation Study Final March 24, 2019

Background

Hamilton Boulevard is a three-lane divided collector road with a posted speed limit of 60 km/hr. It serves the neighbourhoods of McIntyre, Granger, Ingram, Arkell, Logan, and Copper Ridge. Safety concerns have been raised by residents in the last few years, especially regarding left turn movements from the neighbourhood intersections onto Hamilton Boulevard.

Mallard Way is a two-lane residential street just south of McIntyre Drive roundabout, with a posted speed limit of 50 km/hr. It intersects with Hamilton Boulevard as a right-in/right-out only T-intersection.

Heron Drive is a two-lane residential street with a posted speed limit of 50 km/hr. The intersection of Heron Drive and Hamilton Boulevard is stop controlled in the east-west direction and has a marked crosswalk with pedestrian lights on the south leg of the intersection.

Falcon Drive (north) is a two-lane roadway with a posted speed of 50 km/hr. It intersects with Hamilton Boulevard as a T-intersection with stop-control in the eastbound direction.

Lazulite Drive is a two-lane residential street with a posted speed limit of 50 km/hr. It intersects with Hamilton Boulevard between Falcon Drive (north) and Falcon Drive (south) and has a marked crosswalk with pedestrian lights on the south leg of the intersection.

Falcon Drive (south) is a two-lane roadway with a posted speed limit of 50 km/hr. It intersects with Hamilton Boulevard as a T-intersection south of Lazulite Drive with stop-control in the eastbound direction.

Links

Related Projects

Hamilton Boulevard and Falcon Drive (south) Roundabout

Thompson Temporary Median and Traffic Circle

Relevant Plans and Studies

City-Wide Transportation Study (2004)

Transportation Demand Management Plan (2014)

Contact

Project Manager Taylor Eshpeter, P.Eng
Assistant City Engineer | Engineering Services | City of Whitehorse
+1 (867) 689 2143 | email