Will accurate cost estimates for the private portion, if done by the City, be flushed out in the detailed portion of the design? When can homeowners indicate their “opt in/opt out” choice? How would that be done? Would these details be worked out once the policy is passed and put into place?
The more accurate cost estimates for the private portion of the work will be completed at the detailed design phase of the project. These will be completed by the City’s engineering consultant with input from the City.